EHS Compliance for Construction Companies: A Complete Guide to Safer and Compliant Worksites

Construction sites change every day.

A floor that was open yesterday may have formwork today. A clear access route may be occupied by materials tomorrow. New workers, subcontractors, lifting equipment, electrical connections and temporary structures can enter the project at different stages.

This changing environment is what makes Environmental, Health and Safety (EHS) management in construction different from safety management in a relatively stable workplace.

A construction company cannot rely on a one-time safety inspection or a set of documents prepared at the beginning of the project. EHS compliance has to work continuously—from mobilisation and excavation to structural work, installation, finishing and demobilisation.

For developers, contractors and project teams, the practical question is therefore not simply, “Do we have a safety policy?”

The more useful questions are:

Are the hazards associated with today’s work identified?

Are workers and contractors following the agreed controls?

Are high-risk activities being reviewed before work starts?

Are unsafe conditions corrected promptly?

Can the company demonstrate what was inspected, communicated and closed?

A capable EHS consultant for construction companies helps organisations turn these questions into a structured system of risk identification, site controls, inspections, training, documentation and follow-up.

Why EHS Compliance Is Particularly Important in Construction

Construction combines people, machinery, temporary structures, vehicles, electrical systems, work at height, lifting operations and changing site conditions within the same project.

Unlike a fixed facility, the risk profile of a construction project changes as the work progresses.

During early stages, excavation, earth movement and vehicle interaction may require significant attention. Structural work introduces work-at-height, scaffolding, lifting and falling-object risks. Later stages can involve temporary electricity, hot work, material movement, testing, commissioning and simultaneous activities by multiple trades.

The Directorate General Factory Advice Service & Labour Institutes (DGFASLI), under the Ministry of Labour & Employment, maintains dedicated construction safety resources and provides advisory support relating to occupational safety and health in the construction sector.

This reinforces an important principle for construction management: safety cannot be separated from project execution.

Good EHS management should be part of how work is planned, assigned, supervised and reviewed.

What Does EHS Compliance Mean on a Construction Site?

EHS compliance is broader than asking workers to wear helmets and safety shoes.

For a construction organisation, an effective system typically brings together:

  • hazard identification and risk assessment;
  • safe work planning;
  • contractor and subcontractor controls;
  • work-at-height management;
  • excavation safety;
  • lifting and material-handling controls;
  • electrical safety;
  • machinery and equipment safety;
  • fire and hot-work controls;
  • occupational health considerations;
  • welfare and hygiene;
  • emergency preparedness;
  • environmental controls;
  • worker induction and training;
  • inspections and audits;
  • incident reporting and investigation;
  • corrective-action tracking; and
  • records that demonstrate how these activities are managed.

The objective is not to produce more paperwork. The objective is to make sure the controls described in the paperwork are visible at the workplace.

A technically impressive risk assessment has little value if the crew performing the job does not understand the identified hazards or if conditions at the site have changed.

The Current Compliance Context for Construction Companies in India

India’s occupational safety framework has undergone an important transition. The Occupational Safety, Health and Working Conditions Code, 2020 was brought into effect from 21 November 2025 as part of the implementation of the four Labour Codes.

For construction businesses, this makes it particularly important to review compliance systems against the current legal framework rather than relying indefinitely on old templates, registers or procedures.

The OSHWC framework addresses occupational safety, health and working conditions, while construction businesses may also have obligations arising from applicable rules, standards, contractual requirements and state-level requirements.

The exact obligations can vary according to factors such as the nature of the establishment, workforce, activity, jurisdiction and project conditions.

For that reason, construction compliance should not be managed through a generic checklist copied from another site.

A better approach is to maintain an applicability framework that identifies what requirements apply to the particular organisation and project and assigns responsibility for meeting them.

1. Start With Hazard Identification and Risk Assessment

An effective construction EHS programme starts before the task begins.

The project team should understand:

  • what activity will be performed;
  • who will perform it;
  • what equipment will be used;
  • where the activity will take place;
  • what other work is happening nearby;
  • what can reasonably go wrong; and
  • what controls are required before the job starts.

Risk assessment should reflect actual site conditions.

For example, “work at height” is not one uniform activity. Installing façade elements, working from scaffolding, using a mobile elevated work platform and performing work near an unprotected floor opening may all involve different controls.

The same applies to excavation, lifting and electrical work.

A practical risk assessment therefore connects the hazard with the specific activity and the people exposed to it.

It should also be reviewed when circumstances change.

Changes can include:

  • a new method of work;
  • different equipment;
  • a new subcontractor;
  • simultaneous work by other trades;
  • changes in access;
  • weather conditions;
  • design changes; or
  • movement into a different project phase.

Risk assessment should be a working tool, not a document that remains unchanged throughout the project.

2. Control Work at Height

Falls are among the most serious risks on construction sites.

The risk can arise around:

  • slab edges;
  • floor openings;
  • roofs;
  • scaffolds;
  • ladders;
  • temporary platforms;
  • shafts;
  • structural frameworks; and
  • elevated work areas.

Effective control begins with planning the work so exposure is reduced wherever reasonably possible.

Where work at height cannot be avoided, the project team should establish appropriate access, working platforms, edge protection, fall-prevention or fall-arrest arrangements according to the nature of the task.

The condition of the equipment is only one part of the control.

Supervision matters equally.

A construction safety inspection should therefore look beyond whether PPE is present. It should examine whether access is safe, platforms are suitable, openings are protected, equipment is being used correctly and the work method matches actual site conditions.

3. Treat Scaffolding as a Controlled System

Scaffolding is common enough on construction sites that it can become visually ordinary. That familiarity should not reduce the attention given to it.

Scaffold safety involves more than the structure itself.

The EHS team should consider:

  • foundation and stability;
  • access;
  • working platforms;
  • guardrails and edge protection;
  • loading;
  • modifications;
  • housekeeping around the scaffold;
  • inspection arrangements; and
  • controls preventing unauthorised changes.

One recurring problem on active projects is that a scaffold can be altered after it has been inspected.

A handrail may be removed temporarily for material movement. A platform may be changed. Access may be blocked. Components may be disturbed by another trade.

That is why scaffold control requires communication between the people erecting, inspecting, supervising and using the system.

4. Manage Excavation Risks Before People Enter the Area

Excavation work can expose workers to serious hazards if conditions are not properly assessed.

Potential concerns include:

  • collapse of excavation sides;
  • underground utilities;
  • water ingress;
  • vehicles or equipment operating near edges;
  • materials stored too close to the excavation;
  • inadequate access and egress;
  • people or objects falling into the excavation; and
  • changes in ground conditions.

Before excavation starts, the project team should understand the work area, expected depth, ground conditions, nearby services, equipment movement and the method proposed for protecting workers.

Conditions also need ongoing review.

An excavation that was stable at the start of the work should not automatically be assumed to remain unchanged after rain, nearby equipment movement or further excavation.

5. Control Lifting Operations

Construction projects depend heavily on cranes, hoists and other lifting arrangements.

The consequence of an uncontrolled lifting operation can be severe, particularly where loads travel near people, structures or active work areas.

Planning should consider the load, lifting equipment, lifting accessories, operating area, ground conditions, people involved and potential interaction with surrounding work.

Roles should also be clear.

The operator, lifting team, signal personnel, supervisors and workers around the activity should understand how the lift will be controlled.

The objective is to prevent lifting from becoming a routine activity that receives less attention simply because it happens frequently.

Complex or unusual lifts require proportionate planning and review before execution.

6. Take Temporary Electrical Systems Seriously

Construction sites frequently use temporary power arrangements that change as the project progresses.

Cables are moved. Distribution points are relocated. Portable equipment is introduced. Work areas may be exposed to dust, water and physical damage.

Electrical safety therefore requires active management.

Site inspections should consider the physical condition of electrical arrangements, routing and protection of cables, temporary connections, equipment condition and whether access to electrical installations is controlled.

Damaged equipment or improvised connections should not become normalised simply because they are temporary.

“Temporary” describes how long the arrangement will remain—not the level of safety expected from it.

7. Build Contractor Safety Into Contractor Management

Large construction projects may involve several contractors and subcontractors working simultaneously.

This creates an important management challenge.

A principal organisation may have a detailed EHS system, but site performance ultimately depends on how effectively every contractor understands and follows the required controls.

Contractor EHS management should therefore begin before mobilisation.

Depending on the project and scope, this may include reviewing:

  • the nature of the contractor’s work;
  • competency requirements;
  • risk assessments and work methods;
  • responsible supervisors;
  • equipment and tools;
  • worker training;
  • licences or competency records where applicable;
  • emergency arrangements; and
  • previous safety performance where relevant.

Once work begins, contractor performance needs to be monitored through site supervision, inspections, meetings and corrective-action follow-up.

A contractor’s safety responsibility should not exist only in a clause in the contract.

It needs to be visible in day-to-day execution.

8. Make Induction Relevant to the Site

Construction sites can have frequent workforce changes.

Workers may join at different project stages, and specialist contractors may be present for only a short period.

Site induction therefore plays an important role in communicating basic expectations.

A useful induction should address information that workers genuinely need, including:

  • major site hazards;
  • restricted areas;
  • emergency procedures;
  • reporting arrangements;
  • PPE expectations;
  • access and traffic rules;
  • work authorisation requirements;
  • welfare arrangements; and
  • whom to contact when they identify an unsafe condition.

Induction should not become a long presentation that workers sit through without retaining the essential information.

The test is simple: after induction, does the person understand how to work safely on this particular site?

9. Use Toolbox Talks for the Work Actually Happening

Toolbox talks are most valuable when they relate directly to the work being performed.

A generic talk repeated every week can quickly become a formality.

Instead, the topic should respond to actual site conditions.

Examples include:

  • upcoming work at height;
  • lifting operations;
  • heat exposure;
  • electrical hazards;
  • housekeeping issues identified during inspections;
  • changes in traffic movement;
  • excavation activity;
  • recent near misses; or
  • recurring unsafe observations.

Short, relevant communication often has greater value than lengthy sessions disconnected from the crew’s immediate work.

10. Maintain Strong Housekeeping and Material Management

Poor housekeeping is often treated as a minor issue until it contributes to an incident.

Construction work naturally generates packaging, scrap, offcuts, temporary cables, tools and changing material-storage requirements.

Without regular control, walkways become obstructed and work areas become difficult to navigate safely.

Good housekeeping supports:

  • safe access;
  • emergency movement;
  • reduced trip hazards;
  • better material handling;
  • easier inspections; and
  • improved control of combustible waste.

Responsibility should be clear.

If every contractor assumes another team will clean the common area, poor housekeeping becomes a project-wide problem.

11. Include Occupational Health, Not Just Accident Prevention

Construction safety discussions often focus on visible physical hazards. Occupational health deserves equal attention.

Depending on the work, workers may be exposed to:

  • dust;
  • noise;
  • vibration;
  • fumes;
  • chemicals;
  • heat;
  • manual handling demands; and
  • repetitive physical strain.

The OSHWC framework places responsibility on employers for health, safety and working conditions, including matters such as cleanliness, ventilation, drinking water, sanitation and control of workplace contaminants.

Construction EHS programmes should therefore consider exposure over time, not only events that could cause an immediate injury.

12. Plan for Emergencies Before They Occur

Emergency preparedness should reflect the actual construction site.

The project team should consider credible situations such as:

  • fire;
  • fall incidents;
  • structural instability;
  • electrical incidents;
  • excavation emergencies;
  • lifting incidents;
  • medical emergencies; and
  • severe weather or other site-specific events.

Workers need to know how to raise an alarm, where to assemble, how to contact emergency support and who has responsibility during an emergency.

Access routes should also remain usable as the project layout changes.

An emergency plan prepared during mobilisation may need revision when buildings, barricades, access roads and work areas change.

13. Inspect the Site With the Intention of Finding Problems

An inspection is useful only when it challenges the condition of the workplace.

The purpose should not be to prove that the site is safe.

The purpose should be to identify where controls are weak before those weaknesses result in harm.

A construction EHS inspection can examine areas such as:

  • work at height;
  • scaffolding;
  • excavation;
  • electrical arrangements;
  • lifting activities;
  • machinery;
  • access and walkways;
  • housekeeping;
  • material storage;
  • fire prevention;
  • worker PPE;
  • welfare facilities;
  • contractor activities; and
  • environmental controls.

Findings should be specific.

“Improve safety” is not an actionable observation.

“Provide suitable edge protection at the identified open slab edge before work resumes in the area” gives the responsible team something clear to address.

14. Close Corrective Actions Instead of Just Recording Them

Construction companies can accumulate large numbers of inspection observations.

The number of observations recorded is less important than whether significant risks are corrected.

A practical corrective-action system should identify:

  • the issue;
  • risk or priority;
  • responsible person;
  • required action;
  • target date;
  • completion status; and
  • evidence of closure where appropriate.

Repeated findings deserve particular attention.

If the same unsafe condition keeps appearing, the problem may not be individual worker behaviour. There may be a weakness in planning, supervision, resources, contractor control or the work method itself.

Recurring findings are valuable management information.

15. Investigate Near Misses and Incidents for Their Causes

Incident investigation should go beyond asking who made the mistake.

Consider a dropped object.

The immediate explanation may be that a tool was not secured. But further questions may reveal that the work method did not address tool tethering, supervision was inadequate, workers had not been briefed, or exclusion controls below the work area were insufficient.

The purpose of investigation is to understand how the system allowed the event to occur.

The same principle applies to near misses.

A near miss provides an opportunity to correct a weakness without waiting for an injury.

Organisations that encourage early reporting often gain better visibility into site risk than organisations where workers fear blame for raising concerns.

16. Maintain EHS Documentation That Reflects Reality

Construction projects generate substantial documentation.

Depending on the organisation and project, relevant records may include:

  • risk assessments;
  • safe work procedures or method statements;
  • induction records;
  • training records;
  • toolbox-talk records;
  • inspection reports;
  • equipment inspection records;
  • permits and work authorisations;
  • incident and near-miss records;
  • corrective-action registers;
  • emergency drill records;
  • contractor records; and
  • applicable statutory or compliance documentation.

The purpose is traceability.

If a serious issue arises, the organisation should be able to demonstrate not only that a procedure existed but also how it was communicated, implemented, checked and corrected.

What Does an EHS Audit for a Construction Company Examine?

An EHS audit for construction sites provides a more systematic review than a routine site inspection.

The audit may examine both documentation and actual field implementation.

A useful audit asks whether:

The system is defined.
Are responsibilities, procedures and controls established?

The system is implemented.
Are supervisors, contractors and workers actually following them?

The system is monitored.
Are inspections, reviews and performance checks occurring?

Problems are corrected.
Are findings closed and recurring issues investigated?

Management has visibility.
Can project leadership understand significant EHS risks and outstanding actions?

The distinction between paperwork and implementation is crucial.

A construction company may have excellent documentation but weak field control. Another may have experienced supervisors maintaining good practical safety but poor records and inconsistent systems.

Both situations create vulnerabilities.

A mature EHS programme needs both.

Common Warning Signs of Weak Construction EHS Management

Project leadership should pay attention when:

  • the same inspection findings repeatedly return;
  • risk assessments are identical for very different activities;
  • workers cannot explain the controls for their current task;
  • contractor documentation is accepted without field verification;
  • toolbox talks are repetitive and unrelated to current work;
  • corrective actions remain open for long periods;
  • temporary electrical arrangements deteriorate as the project changes;
  • scaffold modifications occur without appropriate review;
  • housekeeping responsibility is unclear;
  • near misses are rarely reported;
  • supervisors view EHS as the safety team’s responsibility alone; or
  • audit preparation becomes a last-minute documentation exercise.

These are not merely documentation issues. They often indicate that safety has become separate from operational decision-making.

What Should Management Review?

Senior project management does not need to inspect every ladder or cable personally.

But management should have visibility into the health of the EHS system.

Useful review areas include:

  • serious and high-potential incidents;
  • significant near misses;
  • high-risk activities planned;
  • overdue corrective actions;
  • repeated inspection findings;
  • contractor performance;
  • training gaps;
  • major changes to site conditions;
  • emergency preparedness;
  • significant occupational-health concerns; and
  • audit findings.

The purpose is to identify patterns and allocate attention where the risk is greatest.

EHS performance should therefore be discussed alongside schedule, cost, quality and productivity—not after those decisions have already been made.

How an EHS Consultant Can Support Construction Companies

An external EHS consultant for construction companies can provide an independent view of whether the organisation’s safety system is working as intended.

Support may include:

  • reviewing applicable EHS requirements;
  • conducting construction-site EHS audits;
  • assessing workplace hazards and controls;
  • reviewing risk-assessment processes;
  • evaluating contractor safety management;
  • reviewing EHS documentation;
  • identifying compliance gaps;
  • supporting corrective-action planning;
  • reviewing training and communication systems; and
  • helping management establish a more consistent compliance framework across projects.

The consultant should not replace the responsibility of site management.

The strongest results come when the consultant provides technical and compliance expertise while project leadership, supervisors and contractors take ownership of implementation.

Building a Stronger EHS Culture on Construction Projects

A safe construction site is not created by the EHS department alone.

Project managers influence safety when they decide schedules.

Procurement teams influence safety when they select contractors and equipment.

Engineers influence safety when they determine methods of work.

Supervisors influence safety through daily control.

Workers influence safety through the decisions they make and the hazards they report.

Senior management influences all of these through expectations and accountability.

That is why a mature EHS culture does not treat safety as an additional activity.

It treats safe execution as part of competent construction management.

EHS Compliance Support for Construction Companies in Chennai, Bangalore and Across India

Construction organisations operating across multiple locations face an additional challenge: maintaining a consistent EHS standard while accounting for project-specific and jurisdiction-specific requirements.

A project in Chennai may have a different workforce profile, site environment, client requirement or operational challenge from a project in Bangalore. A national construction company may need an overarching EHS framework while still adapting implementation to individual sites.

Pragnaa supports organisations with EHS compliance and audit requirements, helping businesses review their systems, identify gaps and strengthen the practical connection between compliance documentation and workplace implementation.

For construction businesses, the goal should not be to prepare for an audit only when one is scheduled.

The better objective is to maintain a site that is ready to demonstrate its controls because those controls are part of everyday operations.

Final Thoughts

Construction EHS compliance works best when it follows the work.

As the project changes, the risk assessment changes. As contractors mobilise, controls need to be communicated. As new activities begin, supervisors need to understand their hazards. As inspections identify weaknesses, corrective actions need to be closed.

The strongest construction EHS systems therefore share a few characteristics: risks are identified before work begins, high-risk activities receive appropriate attention, contractors are actively managed, workers receive relevant communication, inspections challenge real site conditions, incidents and near misses lead to learning, and management maintains visibility over unresolved risk.

For a construction company, this is more than audit preparation.

It is a disciplined way to protect workers, strengthen project control and demonstrate that occupational safety and health responsibilities are being managed systematically.

Frequently Asked Questions

What does an EHS consultant for construction companies do?

An EHS consultant can assess construction-site safety and health systems, review applicable compliance requirements, conduct audits, identify gaps, evaluate risk controls and help the organisation develop corrective actions. The exact scope depends on the project, workforce, activities and the company’s existing EHS framework.

How often should a construction site conduct an EHS audit?

There is no single audit frequency suitable for every project. The frequency should reflect project risk, phase of construction, workforce size, contractor activity, previous findings, client requirements and applicable compliance obligations. Routine inspections and formal audits also serve different purposes and should not be treated as interchangeable.

What is the difference between a construction safety inspection and an EHS audit?

A site inspection generally focuses on current workplace conditions and immediate hazards. An EHS audit is broader and can evaluate the management system, documentation, responsibilities, compliance framework, implementation, monitoring and corrective-action process in addition to field conditions.

Why is contractor EHS management important in construction?

Contractors and subcontractors may perform a large proportion of the work on a construction project. Their activities can create risks for their own workers and for other people on site. Contractor selection, mobilisation checks, communication, supervision, inspections and corrective-action follow-up are therefore important parts of construction EHS management.

What are common EHS risks on construction sites?

The exact risk profile depends on the project, but common areas requiring attention include work at height, scaffolding, excavation, lifting operations, electrical systems, moving equipment, material handling, fire and hot work, occupational exposures, housekeeping and simultaneous activities by multiple contractors.

Can one EHS checklist be used for every construction project?

A common corporate framework can be useful, but the site-level assessment should reflect the actual project. Construction method, project phase, workforce, equipment, site layout, contractor mix and applicable requirements can differ significantly between projects.

How can construction companies improve EHS audit readiness?

Audit readiness improves when compliance is managed continuously rather than shortly before an audit. Keep responsibilities clear, maintain current risk assessments, conduct meaningful inspections, retain relevant records, close corrective actions and verify that documented controls are actually followed at the worksite.

CTE and CTO Approval from Pollution Control Board Chennai

CTE and CTO Approval from Pollution Control Board in Chennai

Struggling with TNPCB rules? This expert guide demystifies the process for CTE and CTO Approval from the Pollution Control Board in Chennai, providing actionable steps and insider tips to avoid costly delays and ensure your business gets its license to operate.

Continue reading

Occupational Safety, Health & Working Conditions Code 2020

Occupational Safety, Health & Working Conditions Code 2020

India’s labour law reforms have introduced comprehensive frameworks to ensure employee safety, welfare, and regulatory compliance. One of the most significant legislations in this regard is the Occupational Safety, Health and Working Conditions Code (OSH Code), which consolidates multiple labour laws into a unified structure.


Definition: Occupational Safety, Health and Working Conditions Code, 2020

The Occupational Safety, Health and Working Conditions Code, 2020 (OSH Code) is a comprehensive labour law enacted by the Government of India to consolidate, simplify, and regulate laws relating to occupational safety, health, and working conditions of workers across various establishments.

It aims to ensure that employees are provided with:

  • A safe and healthy working environment 
  • Adequate welfare facilities 
  • Humane working conditions

The Occupational Safety, Health and Working Conditions Code, 2020 consolidates and replaces 13 existing labour laws related to safety, health, and working conditions into a single framework.

Acts Included in the OSH Code

The following Acts have been merged into the OSH Code:

  1. Factories Act, 1948 
  2. Mines Act, 1952 
  3. Dock Workers (Safety, Health and Welfare) Act, 1986 
  4. Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996 
  5. Plantation Labour Act, 1951 
  6. Contract Labour (Regulation and Abolition) Act, 1970 
  7. Inter-State Migrant Workmen (Regulation of Employment and Conditions of Service) Act, 1979 
  8. Working Journalists and Other Newspaper Employees (Conditions of Service) and Miscellaneous Provisions Act, 1955 
  9. Working Journalists (Fixation of Rates of Wages) Act, 1958 
  10. Motor Transport Workers Act, 1961 
  11. Sales Promotion Employees (Conditions of Service) Act, 1976 
  12. Beedi and Cigar Workers (Conditions of Employment) Act, 1966 
  13. Cine Workers and Cinema Theatre Workers Act, 1981 

1. Mandatory Registration of Establishments

Under the Code, every applicable establishment must be registered before employing workers. Employers are required to:

  • Obtain registration through prescribed procedures 
  • Intimate any changes in ownership or management within 30 days 
  • Notify authorities about commencement and closure of operations electronically 

Failure to register prohibits the employer from engaging any workers. 


2. Duties of Employers: Ensuring Workplace Safety

Employers carry primary responsibility for maintaining a safe and healthy work environment. Key obligations include:

  • Providing a workplace free from hazards and occupational risks 
  • Ensuring compliance with prescribed safety standards 
  • Conducting periodic health examinations for employees 
  • Maintaining welfare facilities and safe working conditions 

These measures aim to reduce workplace injuries and promote employee well-being. 


3. Contract Labour: Compliance and Restrictions

The Code introduces stricter provisions governing contract labour:

Applicability:

  • Applies to establishments employing 50 or more contract workers 

Key Provisions:

  • Contractors must obtain valid licenses before engagement 
  • Wages must be paid through bank transfer or electronic mode 
  • Principal employer is liable if contractor fails to pay wages 
  • Welfare facilities must be provided by the principal employer 

Restrictions:

  • Employment of contract labour in core activities is generally prohibited, except under specific conditions such as:
    • Intermittent work 
    • Sudden increase in workload 
    • Activities traditionally outsourced 

4. Inter-State Migrant Workers Protection

The Code extends protection to inter-state migrant workers:

  • Applicable where 10 or more migrant workers are employed 
  • Employers must ensure:
    • Suitable working conditions 
    • Reporting of accidents to both states 
    • Welfare measures considering their migrant status 

Additionally, a centralized portal is introduced for worker registration and tracking. 


5. Health, Safety, and Welfare Measures

Employers must implement comprehensive safety systems, including:

  • Formation of Safety Committees in larger establishments 
  • Appointment of Safety Officers based on workforce size 
  • Maintenance of safe infrastructure, equipment, and work processes 
  • Protection against hazardous substances and occupational diseases 

The Code also lists notifiable diseases and mandates preventive actions. 


6. Special Provisions for Factories and Construction Work

Factories:

  • Prior approval required for site, construction, and expansion 
  • Licensing and renewal governed by prescribed rules 
  • Deemed approval if no response within specified time 

Construction Workers:

  • Employers must ensure workers are medically fit for hazardous tasks 
  • Workers with health risks cannot be assigned dangerous operations 
The Occupational Safety, Health and Working Conditions Code, 2020 (OSH&WC)
Sl.No Query Reply
1 Are leave encashment provisions under the OSH & WC Code applicable only to workers, sales promotion employees, and working journalists, or to all employees? Leave-related provisions apply to managerial, supervisory, and corporate office staff? Leave provisions apply to workers as per the OSH & WC Code, 2020 and only to those supervisors having wage not exceeding Rs 18,000/ per month. The definition of worker includes sales promotion employees and working journalists.
2 What is the maximum number
of days of leave that can be carried forward to the succeeding year under the applicable Labour Codes and Rules? If Employer agrees to carry forward 120 days of Leave to next calendar year, whether he is allowed to do so?
A worker can carry forward up to 30 days of leave to the succeeding calendar year. Further, a worker who has applied for leave with wages and has not been granted, can carry forward the leave refused without any limit.
Sl.No Query Reply
3 Under the Labour Codes, who is eligible for leave encashment—only workers or employee? Whether the Relationship Manager and Sales person working independently (doesn’t supervises anyone) and drawing wage of more than ₹18,000 are entitled for Leave Encashment? Worker is entitled for leave encashment.

The sales promotion employees are included in the definition of Worker under Section-2(1)(zzl) of OSH&WC Code, 2020.
4 Is the provision of crèche facility dependent on any specific gender composition of
the workforce?
The creche facility is available to employees, irrespective of gender.
5 At what stage does overtime become payable under the OSH&WC Code, when it exceeds 8 hrs of daily working hours or 48 hrs of weekly limit? If maximum working hours limit is prescribed as 12 Hours by the appropriate government, whether Overtime is applicable
for Hours exceeding 8 Hours on a particular day?
The Code prescribes working hours as 8 hours per day.

If, a worker works for more than eight hours in any day as daily wager, or for more than forty-eight hours in any week, as the case may be, a worker shall in respect of such overtime work be entitled to wages at the rate of twice the normal rate of wages and shall be paid at the end of each wage period.
6 Where the OSH&WC Code permits accumulation of leave up to 30 days, but a State law (e.g., Andhra Pradesh) allows 60 days, which provision will prevail? The provision of the OSH&WC, 2020 Code will prevail over the State Law for provisions which are inconsistent with the Code. However, an employee is entitled to benefits under State Law if more favourable to him than those under the Code.
7 What is the maximum number of leave days that can be encashed under the applicable Labour Code(s)? There   is   no   prescribed   maximum   limit   for   leave encashment under the OSH&WC Code, 2020. Leave exceeding 30 days, if applied but not granted by the employer, can be encashed at the end of the calendar year. At the time of separation from service, the worker is entitled to encash the leave to his/ her credit.
8 Where the age threshold for annual health check-ups differ between Central Rules and State Rules, which provision will apply? Central rules will be applicable on the establishments where Central Government is Appropriate Government and state rules will be applicable on the establishments where State Government is Appropriate Government.